Salt Spray Chamber Installation and Setup

Pollyanna Sidell - Associated Environmental Systems

Salt-Spray-BlogIn this post we will cover the following:

  • Unpacking 
  • Power and utility requirements 
  • Nozzle assembly 
  • Ventilation 
  • Drainage
  • Air supply 

Unpacking your Salt Spray Chamber:

Associates Environmental Systems MX series salt spray chambers are constructed from clear lucite sheeting. While lucite is quite durable, it can be damaged during shipping. Make sure to inspect the chambers for cracks that may have occurred during shipping. Even small cracks will spread over time so be sure to contact AES immediately if you do find any signs of shipping damage. 

Place your MX chamber on a hard, level surface in an area with plenty of ventilation. Salt spray chambers are designed to create a corrosive atmosphere so you're going to want to keep the chamber in a room with enough space and ventilation to minimize rusting in the surrounding test area (more on ventilation below). 

Power and Utility Requirements:

Power - The chamber and the electric panels are completely wired for use. The power source must be properly grounded the standard power requirements are listed on page 3-1 your chamber’s user manual. 

Water - The chamber require single distilled (demineralized) water. Untreated tap water should always be fed through a demineralizer cartridge before use. You can learn more about AES water demineralizer systems by clicking here. Demineralizer systems can be purchased directly from the AES sales team and parts department.

Salt Spray Nozzle assembly:

All AES salt spray chambers are shipped with an atomizing nozzle installed. If you need to replace the nozzle, follow these steps: 

  1. Apply a quarter inch wide strip of teflon tape to all joints. Take care to avoid allowing any tape to enter the inside of the pipe. It is recommended that the tape be applied two or three threads back from the end of the pipe.
  2. Take care to keep all foreign materials from entering the pipe and screw the short acrylic quarter-inch pipe nipple into the tapped hole on the inside of the chamber. Hand tightening is all that is required.
  3. Screw the salt spray nozzle to the acrylic nipple installed in step 2 and tighten by hand. Turn the nozzle so the spray direction is toward the front of the chamber and the other tapped hole in the nozzle points down. 
  4. Screw the long acrylic quarter inch threaded pipe into the tapped hole at the bottom of the nozzle until it is snug. This pipe is called the siphon tube 
  5. Place the nylon mesh strainer over the other end of the siphon tube and hold it in place with rubber bands. If the special MIL-STD-202 or MIL-STD-810 filter is used, attach it to the end of the siphon tube.
  6. Place the salt reservoir cover on the top of the salt reservoir 

 

Salt Spray Chamber Ventilation: 

MX Series chambers need to be exhausted in order to prevent back pressure within the chamber. When setting up the chamber, make sure to install a non corrosive 3/4 inch pipe from the chamber exhaust to a point outside the building. The outdoor end of the exhaust pipe should be shielded to avoid the effects of air currents or winds. The pipe should be kept as short as possible, as straight as possible, should slope continuously down from the chamber and should have no liquid traps. Flexible hose should be avoided unless care is taken to ensure that it does not sag between the supports and create a liquid trap. For exhaust lengths of over 10 feet, a two-inch line should be used. If you need to pipe the exhaust to the roof, or for any other reason it is necessary to pipe upward from the chamber exhaust, use a T-fitting instead of an elbow. Orient the T so an 18 inch drop line and drain can be added to ensure that the exhaust line remains clear at all times. 

Salt Spray Chamber Air Supply:

MX Series chambers need clean, oil-free compressed air. The chamber has been furnished with the valve marked air at the rear end of the chamber. The compressed air requirements for the MX series are as follows:

compressed-air-requirments
That wraps up the installation. You are now ready to begin operation. If you have any other questions, check out our MX series video series here or feel free to contact an AES representative directly.

Follow AES on

Subscribe to News and Stories

All, Technology, Battery, Alternative & Renewable Energy, Energy
Sep 13,2019
Electrical Engineer’s Research Focused on Making The Power Grid More Reliable

Electrical engineer’s research focused on making the power grid more reliable Olga Lavrova, associate professor of electrical[...]

Aerospace & Defense, Electronics, Technology, Sensors, Robotics
Sep 12,2019
Drones, Climate Change and Thermal Shock Chambers

On August 2nd, UAVOS and Stratodynamics announced that they had accomplished a pioneering flight of the HiDRON glider system.[...]

All, Consumer Electronics, Aerospace & Defense, Electronics, Technology, Robotics, Additive Manufacturing
Sep 11,2019
Taking The Next Giant Leaps

MIT faculty, staff, and students are working toward the next great advances — ones that could propel humans back to the moon,[...]

All, Consumer Electronics, Electronics, Technology, Autonomous Vehicles
Sep 10,2019
New Insulation Technique Paves The Way For More Powerful and Smaller Chips

Researchers at KU Leuven and imec have successfully developed a new technique to insulate microchips. The technique uses[...]

All, Consumer Electronics, Battery, Alternative & Renewable Energy, Energy
Sep 09,2019
New Consortium for Battery Innovation

A global battery consortium charged with advancing lead battery technology has re-launched as it prepares to unveil a raft of[...]